Saturday, May 10, 2008

Using the SIMATIC NET Commissioning Wizard

Using the SIMATIC NET Commissioning Wizard

This is a little difficult to document as it manifests itself in different ways dependant upon the current state of settings that may have been made previously.

Initial Settings (New 5613 card or all settings lost)

Initial running of the Wizard is usually either as 7 or 8 steps.  Thus the step numbers

May not be identical to those shown below.  Subsequent running of the Wizard is usually the steps 1(4) to 4(4) at the bottom of the page.

SIMATIC NET  Commissioning Wizard 1(8)

Click Next

2(8)

Select:  Use Module for Productive Operation in Configured PC Station.

Name:  CP5613 / CP5614                              Index  4

Address:  1    (for PC_HNG_F41)    (PC_HNG_F44 = 11)             Bus Profile DP

Select Profibus

Select DP

Speed:  1.5 MBPS

3(8)

Do NOT select anything for Ethernet.

4(8)

Do NOT select anything for OPC

Setup continues with sections 5(8)  to  8(8)  which are same as sections 1(4)  to  4(4) below.

Subsequent Running of Commissioning Wizard

SIMATIC NET  Commissioning Wizard 1(4)

PC Station Wizard

Select     EDIT

Select     Bahad4     (the project)

Click Next

Configuration 2(4)

Click Next

Symbols 3(4)

Select Do NOT Use a Symbol File

Click Next

The SIMATIC NET Commissioning Wizard is Finished 4(4)

Click Finish

1 comment:

sunil malhotra said...

very helpful for me to understand the concept. thanks

factory automation