Using the SIMATIC NET Commissioning Wizard
This is a little difficult to document as it manifests itself in different ways dependant upon the current state of settings that may have been made previously.
Initial Settings (New 5613 card or all settings lost)
Initial running of the Wizard is usually either as 7 or 8 steps. Thus the step numbers
May not be identical to those shown below. Subsequent running of the Wizard is usually the steps 1(4) to 4(4) at the bottom of the page.
SIMATIC NET Commissioning Wizard 1(8)
Click Next
2(8)
Select: Use Module for Productive Operation in Configured PC Station.
Name: CP5613 / CP5614 Index 4
Address: 1 (for PC_HNG_F41) (PC_HNG_F44 = 11) Bus Profile DP
Select Profibus
Select DP
Speed: 1.5 MBPS
3(8)
Do NOT select anything for Ethernet.
4(8)
Do NOT select anything for OPC
Setup continues with sections 5(8) to 8(8) which are same as sections 1(4) to 4(4) below.
Subsequent Running of Commissioning Wizard
SIMATIC NET Commissioning Wizard 1(4)
PC Station Wizard
Select EDIT
Select Bahad4 (the project)
Click Next
Configuration 2(4)
Click Next
Symbols 3(4)
Select Do NOT Use a Symbol File
Click Next
The SIMATIC NET Commissioning Wizard is Finished 4(4)
Click Finish